How To Ship Modular Plastic Recycling Stations

 

Ship modular recycling stations? Get expert advice & quotes from Shipping International. We handle FCL, LCL, OOG & breakbulk shipments to/from the UK. Contact us today!

 

 

Shipping Modular Plastic Recycling Stations: A Guide

Shipping Options

  • FCL (Full Container Load): Most cost-effective for large orders filling a 20' or 40' container. Stations are secured to the container floor. Estimated Transit Time: 2-6 weeks (depending on origin and destination)
  • LCL (Less than Container Load): For smaller orders sharing a container with other cargo. More expensive per unit. Estimated Transit Time: 3-8 weeks (depending on origin and destination and port congestion)
  • OOG (Out of Gauge): For stations exceeding standard container dimensions or weight limits. Requires specialized handling and potentially Breakbulk shipment. Estimated Transit Time: 4-10 weeks (depending on origin and destination and handling requirements)
  • Breakbulk: For exceptionally large/heavy stations or when quantity doesn't justify a full container. Most expensive, but offers flexibility for oversized cargo. Estimated Transit Time: Variable, often longer than other methods.

Shipping from & to the UK

Information regarding Shipping International is provided below.

Website: shippinginternational.co.uk

Email: This email address is being protected from spambots. You need JavaScript enabled to view it.

Tel: 0330 027 0450

Factors Affecting Shipping Costs

  • Quantity of recycling stations
  • Dimensions and weight of each station
  • Origin and destination addresses
  • Chosen shipping method (FCL, LCL, OOG, Breakbulk)
  • Insurance requirements
  • Incoterms selected (see below)

Detailed Packaging Specifications

  • Palletization: Stations must be securely palletized using robust pallets appropriate for the weight and dimensions.
  • Wrapping: Use stretch wrap to secure the stations to the pallet, ensuring complete coverage.
  • Corner Protection: Employ corner boards or edge protectors to prevent damage to vulnerable corners and edges.
  • Internal Protection: Consider using void fill (e.g., bubble wrap, air pillows) to prevent shifting and impact damage during transit.
  • External Protection: Use weatherproof materials such as shrink wrap or corrugated cardboard for added protection against moisture and rough handling.

Incoterms Explanation

Incoterms define responsibilities and costs between buyer and seller. Common examples include:

  • DDP (Delivered Duty Paid): Seller bears all costs and risks until delivery at the named place in the buyer's country.
  • CIF (Cost, Insurance, and Freight): Seller pays for costs and freight to the named port of destination. Buyer is responsible for import duties and inland transportation.

Preparing Your Shipment

  • Documentation: Provide accurate and complete documentation, including a commercial invoice, packing list, and any necessary permits or certificates.

Unlock Global Reach with Expert Shipping Support

We understand the complexities of international shipping. Let us help you navigate them. 

Start the Conversation Today.