How To Ship Methane Gas Recovery Systems

 

Shipping a methane gas recovery system? Learn how to navigate UK port selection, permits, heavy-lift equipment, and more for a smooth, safe international shipment.

 

 

Shipping a Methane Gas Recovery System from/to the UK

1. Assessing the Cargo

  • Dimensions (L x W x H):
  • Weight:
  • Center of Gravity:
  • Fragile Components:
  • Cargo Classification (OOG/Breakbulk/FCL):

Precisely determine the dimensions, weight, and center of gravity of each component. Identify any fragile parts needing special protection. Classify the cargo as OOG (Out of Gauge), Breakbulk, or, if feasible, FCL (Full Container Load).

2. Packaging & Crating

2.1 Material Selection

Use robust, weatherproof materials. Material choices depend on component fragility and weight. Consider marine-grade plywood (e.g., Birch plywood meeting BS 1088), steel (grades offering corrosion resistance), and shock-absorbing inserts (e.g., polyurethane foam).

2.2 Packaging Techniques

Gas cylinders need specialized cradles and secure fastenings. Electronic components require anti-static packaging and vibration protection. Use appropriate bracing and dunnage to prevent shifting during transit.

2.3 Securing Methods

Employ robust strapping, banding, and corner protection to prevent damage. Ensure all packages are clearly labelled with handling instructions, weight, dimensions, and contact information.

3. Port Selection

3.1 UK Port Capabilities

Ports such as Felixstowe, Southampton, and Immingham offer heavy-lift facilities. Consider quayside length, crane lifting capacity (specify minimum tonnage required for your system), and proximity to your origin/destination.

4. Vessel Selection

4.1 Suitable Vessel Types

Heavy-lift vessels with sufficient lifting capacity are necessary. Multipurpose vessels may also be suitable depending on cargo characteristics. Confirm the vessel's lifting capacity and suitability for OOG cargo.

5. Heavy Lift Equipment

Arrange for cranes, forklifts, and specialized trailers at both origin and destination ports. Confirm equipment availability and specifications (e.g., crane lifting capacity, trailer dimensions) well in advance.

6. Permits & Documentation

6.1 Regulatory Compliance

Obtain export/import licenses, customs declarations, and any special permits for hazardous materials (if applicable). Comply with all relevant UK and international regulations, including safety standards and environmental considerations. Ensure all documentation is accurate and complete.

7. Transportation

Arrange inland transportation using specialized low-bed trailers or other suitable vehicles. Coordinate transport schedules with vessel arrival/departure times.

8. Insurance

8.1 Insurance Coverage

Secure comprehensive marine cargo insurance and liability insurance covering potential damage, loss, or delay during transit.

9. Supervision

Arrange for experienced personnel to supervise loading, unloading, and transit to maintain cargo integrity.

10. Communication

Maintain clear and consistent communication with all involved parties throughout the shipping process.

11. Case Study (Example)

A recent project involved Shipping International shipping a similar system from Aberdeen to Rotterdam. The system's unusual dimensions and weight presented challenges, requiring careful planning and the use of a specialized heavy-lift vessel. Through meticulous attention to detail and effective communication, the shipment was completed successfully, on time and without incident, highlighting the importance of proactive planning and expert logistics management.

Shipping International Contact Information

Logistics Expert, Shipping International
This email address is being protected from spambots. You need JavaScript enabled to view it.
Tel: 0330 027 0450

Unlock Global Reach with Expert Shipping Support

We understand the complexities of international shipping. Let us help you navigate them. 

Start the Conversation Today.