Project Cargo Exports from UK to Solapur, Maharashtra
Shipping Flat-Racks to Solapur, Maharashtra: Heavy Lift & Project Cargo Solutions
Shipping International specialises in the transport of oversized, out-of-gauge (OOG), and heavy lift cargo, ensuring secure and timely delivery across the globe. Our extensive experience in managing complex logistical challenges positions us as your trusted partner for moving substantial, heavy, and non-standard cargo across international borders.
Key Advantages of Our Heavy Lift & Project Cargo Services
- Expertise in Complex Logistics: Our experienced team excels in managing large and complex cargo operations. We provide bespoke logistics strategies tailored to your specific requirements, whether for construction equipment, industrial machinery, or specialised materials.
- Customised Solutions for Each Project: Recognising the uniqueness of every project, we dedicate time to understanding your specific needs. We conduct feasibility studies, route surveys, and compliance checks to deliver optimal logistics solutions. Our tailored approach ensures the safe and efficient movement of your cargo.
- Integrated Planning and Coordination: We manage every detail from initial planning to final delivery. This includes route assessments, port logistics, customs brokerage, and regulatory compliance. Our comprehensive project management ensures seamless transportation, minimising potential delays.
- Advanced Equipment and Technology: We utilise advanced lifting equipment, flat racks, open-top containers, and specialised vessels to handle even the most demanding loads. Our teams employ modern tools, such as 3D modelling for stowage and lashing planning, ensuring the secure transport of every shipment.
- Global Network for Seamless Delivery: Our established network of trusted partners and agents ensures connectivity to even the most remote destinations. Shipping International provides seamless connectivity and real-time tracking, keeping you informed at every stage.
Our Heavy Lift & Project Cargo Service Portfolio
- End-to-End Project Management: We manage the entire logistics process from pre-planning to on-site delivery, ensuring timely and secure transport.
- Customs Brokerage & Compliance: We navigate complex international regulations to ensure seamless customs clearance and full compliance.
- Specialised Equipment Handling: Our experts employ floating cranes, mobile cranes, and other specialised lifting solutions to transport your heavy and oversized cargo.
- Risk Assessment & Mitigation: We conduct thorough risk assessments to identify potential challenges and develop robust contingency plans.
- Door-to-Door Services: We offer comprehensive door-to-door solutions using road, rail, and barge transport to meet your specific delivery requirements.
Sectors Supported
- Construction & Infrastructure
- Energy (Oil & Gas, Renewables)
- Manufacturing & Industrial
- Mining & Minerals
- Technology & Electronics
Project Cargo Expertise
- Out of Gauge Cargo (OOG): We carefully load and secure cargo exceeding standard container dimensions on flat racks or platforms.
- Breakbulk Solutions: For items unsuitable for containers, we utilise breakbulk solutions, securing cargo on specialised beds with multiple flat racks, ensuring adherence to international maritime safety codes.
- Heavy Lift Cargo: Our team manages extremely heavy loads, including machinery, construction materials, and oversized equipment.
Sustainability Commitment
We are dedicated to minimising the environmental impact of logistics. Our CO2 emissions calculator enables clients to monitor and improve the carbon footprint of their shipments.
Maersk
India West Coast
| Origin | Departure | Destination | Arrival | Transit | Routing |
|---|---|---|---|---|---|
| Liverpool [GBLIV] | 2026-07-02 | Mundra [INMUN] | 2026-08-17 | 46 days | 2 t/s |
| Liverpool [GBLIV] | 2026-07-02 | Pipavav Port [INPAV] | 2026-08-18 | 47 days | 2 t/s |
| Liverpool [GBLIV] | 2026-07-02 | Hazira [INHZA] | 2026-08-17 | 46 days | 2 t/s |
| Liverpool [GBLIV] | 2026-07-02 | Nhava Sheva [INNSA] | 2026-08-16 | 45 days | 2 t/s |
| Southampton [GBSOU] | 2026-07-03 | Pipavav Port [INPAV] | 2026-08-18 | 46 days | 2 t/s |
| Southampton [GBSOU] | 2026-07-03 | Nhava Sheva [INNSA] | 2026-08-16 | 44 days | 2 t/s |
| Southampton [GBSOU] | 2026-07-03 | Mundra [INMUN] | 2026-08-17 | 45 days | 2 t/s |
| Southampton [GBSOU] | 2026-07-03 | Hazira [INHZA] | 2026-08-17 | 45 days | 2 t/s |
| London Gateway Port [GBLGP] | 2026-07-04 | Pipavav Port [INPAV] | 2026-08-18 | 45 days | 1 t/s |
| London Gateway Port [GBLGP] | 2026-07-04 | Hazira [INHZA] | 2026-08-10 | 37 days | 1 t/s |
| London Gateway Port [GBLGP] | 2026-07-04 | Nhava Sheva [INNSA] | 2026-08-13 | 40 days | Direct |
| London Gateway Port [GBLGP] | 2026-07-07 | Mundra [INMUN] | 2026-08-22 | 46 days | 1 t/s |
| Grangemouth [GBGRG] | 2026-07-07 | Hazira [INHZA] | 2026-08-24 | 48 days | 2 t/s |
| Grangemouth [GBGRG] | 2026-07-07 | Pipavav Port [INPAV] | 2026-08-25 | 49 days | 2 t/s |
| Grangemouth [GBGRG] | 2026-07-07 | Nhava Sheva [INNSA] | 2026-08-23 | 47 days | 2 t/s |
| Grangemouth [GBGRG] | 2026-07-07 | Mundra [INMUN] | 2026-08-24 | 48 days | 2 t/s |
| Liverpool [GBLIV] | 2026-07-09 | Mundra [INMUN] | 2026-08-24 | 46 days | 2 t/s |
| Liverpool [GBLIV] | 2026-07-09 | Nhava Sheva [INNSA] | 2026-08-23 | 45 days | 2 t/s |
| Liverpool [GBLIV] | 2026-07-09 | Pipavav Port [INPAV] | 2026-08-25 | 47 days | 2 t/s |
| Liverpool [GBLIV] | 2026-07-09 | Hazira [INHZA] | 2026-08-24 | 46 days | 2 t/s |
| Southampton [GBSOU] | 2026-07-10 | Mundra [INMUN] | 2026-08-24 | 45 days | 2 t/s |
| Southampton [GBSOU] | 2026-07-10 | Nhava Sheva [INNSA] | 2026-08-23 | 44 days | 2 t/s |
| Southampton [GBSOU] | 2026-07-10 | Hazira [INHZA] | 2026-08-24 | 45 days | 2 t/s |
| Southampton [GBSOU] | 2026-07-10 | Pipavav Port [INPAV] | 2026-08-25 | 46 days | 2 t/s |
| London Gateway Port [GBLGP] | 2026-07-11 | Nhava Sheva [INNSA] | 2026-08-20 | 40 days | Direct |
| London Gateway Port [GBLGP] | 2026-07-11 | Pipavav Port [INPAV] | 2026-08-25 | 45 days | 1 t/s |
| London Gateway Port [GBLGP] | 2026-07-11 | Hazira [INHZA] | 2026-08-17 | 37 days | 1 t/s |
| Grangemouth [GBGRG] | 2026-07-14 | Pipavav Port [INPAV] | 2026-09-01 | 49 days | 2 t/s |
| Grangemouth [GBGRG] | 2026-07-14 | Hazira [INHZA] | 2026-08-31 | 48 days | 2 t/s |
| Grangemouth [GBGRG] | 2026-07-14 | Mundra [INMUN] | 2026-08-31 | 48 days | 2 t/s |
| Grangemouth [GBGRG] | 2026-07-14 | Nhava Sheva [INNSA] | 2026-08-30 | 47 days | 2 t/s |
| London Gateway Port [GBLGP] | 2026-07-15 | Mundra [INMUN] | 2026-08-29 | 45 days | 1 t/s |
| Liverpool [GBLIV] | 2026-07-16 | Hazira [INHZA] | 2026-08-31 | 46 days | 2 t/s |
| Liverpool [GBLIV] | 2026-07-16 | Mundra [INMUN] | 2026-08-31 | 46 days | 2 t/s |
| Liverpool [GBLIV] | 2026-07-16 | Nhava Sheva [INNSA] | 2026-08-30 | 45 days | 2 t/s |
| Liverpool [GBLIV] | 2026-07-16 | Pipavav Port [INPAV] | 2026-09-01 | 47 days | 2 t/s |
| Southampton [GBSOU] | 2026-07-17 | Hazira [INHZA] | 2026-08-31 | 45 days | 2 t/s |
| Southampton [GBSOU] | 2026-07-17 | Mundra [INMUN] | 2026-08-31 | 45 days | 2 t/s |
| Southampton [GBSOU] | 2026-07-17 | Nhava Sheva [INNSA] | 2026-08-30 | 44 days | 2 t/s |
| Southampton [GBSOU] | 2026-07-17 | Pipavav Port [INPAV] | 2026-09-01 | 46 days | 2 t/s |
| London Gateway Port [GBLGP] | 2026-07-18 | Pipavav Port [INPAV] | 2026-09-01 | 45 days | 1 t/s |
| London Gateway Port [GBLGP] | 2026-07-18 | Nhava Sheva [INNSA] | 2026-08-27 | 40 days | Direct |
| London Gateway Port [GBLGP] | 2026-07-18 | Hazira [INHZA] | 2026-08-24 | 37 days | 1 t/s |
| Grangemouth [GBGRG] | 2026-07-21 | Mundra [INMUN] | 2026-08-31 | 41 days | 2 t/s |
| Grangemouth [GBGRG] | 2026-07-21 | Nhava Sheva [INNSA] | 2026-08-30 | 40 days | 2 t/s |
| Grangemouth [GBGRG] | 2026-07-21 | Pipavav Port [INPAV] | 2026-09-01 | 42 days | 2 t/s |
| Grangemouth [GBGRG] | 2026-07-21 | Hazira [INHZA] | 2026-08-31 | 41 days | 2 t/s |
| London Gateway Port [GBLGP] | 2026-07-22 | Mundra [INMUN] | 2026-09-05 | 45 days | 1 t/s |
| Liverpool [GBLIV] | 2026-07-23 | Mundra [INMUN] | 2026-09-07 | 46 days | 2 t/s |
| Liverpool [GBLIV] | 2026-07-23 | Nhava Sheva [INNSA] | 2026-09-06 | 45 days | 2 t/s |
| Liverpool [GBLIV] | 2026-07-23 | Pipavav Port [INPAV] | 2026-09-08 | 47 days | 2 t/s |
| Liverpool [GBLIV] | 2026-07-23 | Hazira [INHZA] | 2026-09-07 | 46 days | 2 t/s |
| Southampton [GBSOU] | 2026-07-24 | Nhava Sheva [INNSA] | 2026-09-06 | 44 days | 2 t/s |
| Southampton [GBSOU] | 2026-07-24 | Hazira [INHZA] | 2026-09-07 | 45 days | 2 t/s |
| Southampton [GBSOU] | 2026-07-24 | Mundra [INMUN] | 2026-09-07 | 45 days | 2 t/s |
| Southampton [GBSOU] | 2026-07-24 | Pipavav Port [INPAV] | 2026-09-08 | 46 days | 2 t/s |
| London Gateway Port [GBLGP] | 2026-07-25 | Nhava Sheva [INNSA] | 2026-09-03 | 40 days | Direct |
| London Gateway Port [GBLGP] | 2026-07-25 | Pipavav Port [INPAV] | 2026-09-08 | 45 days | 1 t/s |
| London Gateway Port [GBLGP] | 2026-07-25 | Hazira [INHZA] | 2026-08-31 | 37 days | 1 t/s |
| Grangemouth [GBGRG] | 2026-07-28 | Pipavav Port [INPAV] | 2026-09-08 | 42 days | 2 t/s |
| Grangemouth [GBGRG] | 2026-07-28 | Mundra [INMUN] | 2026-09-07 | 41 days | 2 t/s |
| Grangemouth [GBGRG] | 2026-07-28 | Nhava Sheva [INNSA] | 2026-09-06 | 40 days | 2 t/s |
| Grangemouth [GBGRG] | 2026-07-28 | Hazira [INHZA] | 2026-09-07 | 41 days | 2 t/s |
| London Gateway Port [GBLGP] | 2026-07-29 | Mundra [INMUN] | 2026-09-19 | 52 days | 1 t/s |
India East Coast
| Origin | Departure | Destination | Arrival | Transit | Routing |
|---|---|---|---|---|---|
| Liverpool [GBLIV] | 2026-07-02 | Haldia [INHAL] | 2026-08-28 | 57 days | 2 t/s |
| Liverpool [GBLIV] | 2026-07-02 | Kolkata [INCCU] | 2026-08-30 | 59 days | 2 t/s |
| Southampton [GBSOU] | 2026-07-03 | Haldia [INHAL] | 2026-08-28 | 56 days | 2 t/s |
| Southampton [GBSOU] | 2026-07-03 | Kolkata [INCCU] | 2026-08-30 | 58 days | 2 t/s |
| London Gateway Port [GBLGP] | 2026-07-07 | Haldia [INHAL] | 2026-08-28 | 52 days | 1 t/s |
| London Gateway Port [GBLGP] | 2026-07-07 | Kolkata [INCCU] | 2026-08-23 | 47 days | 1 t/s |
| London Gateway Port [GBLGP] | 2026-07-07 | Visakhapatnam [INVTZ] | 2026-08-19 | 43 days | 1 t/s |
| Grangemouth [GBGRG] | 2026-07-07 | Haldia [INHAL] | 2026-08-28 | 52 days | 2 t/s |
| Grangemouth [GBGRG] | 2026-07-07 | Kolkata [INCCU] | 2026-08-30 | 54 days | 2 t/s |
| Liverpool [GBLIV] | 2026-07-09 | Kolkata [INCCU] | 2026-09-06 | 59 days | 2 t/s |
| Liverpool [GBLIV] | 2026-07-09 | Haldia [INHAL] | 2026-09-02 | 55 days | 2 t/s |
| Southampton [GBSOU] | 2026-07-10 | Kolkata [INCCU] | 2026-09-06 | 58 days | 2 t/s |
| Southampton [GBSOU] | 2026-07-10 | Haldia [INHAL] | 2026-09-02 | 54 days | 2 t/s |
| Grangemouth [GBGRG] | 2026-07-14 | Haldia [INHAL] | 2026-09-02 | 50 days | 2 t/s |
| Grangemouth [GBGRG] | 2026-07-14 | Kolkata [INCCU] | 2026-09-06 | 54 days | 2 t/s |
| London Gateway Port [GBLGP] | 2026-07-15 | Kolkata [INCCU] | 2026-08-30 | 46 days | 1 t/s |
| London Gateway Port [GBLGP] | 2026-07-15 | Haldia [INHAL] | 2026-08-28 | 44 days | 1 t/s |
| London Gateway Port [GBLGP] | 2026-07-22 | Kolkata [INCCU] | 2026-09-06 | 46 days | 1 t/s |
| London Gateway Port [GBLGP] | 2026-07-22 | Haldia [INHAL] | 2026-09-02 | 42 days | 1 t/s |
India South Coast
| Origin | Departure | Destination | Arrival | Transit | Routing |
|---|---|---|---|---|---|
| Southampton [GBSOU] | 2026-07-01 | Ennore [INENR] | 2026-08-15 | 45 days | 1 t/s |
| Liverpool [GBLIV] | 2026-07-02 | Tuticorin [INTUT] | 2026-08-24 | 53 days | 2 t/s |
| Southampton [GBSOU] | 2026-07-03 | Tuticorin [INTUT] | 2026-08-24 | 52 days | 2 t/s |
| London Gateway Port [GBLGP] | 2026-07-07 | Cochin [INCOK] | 2026-08-21 | 45 days | 1 t/s |
| London Gateway Port [GBLGP] | 2026-07-07 | Ennore [INENR] | 2026-08-15 | 39 days | Direct |
| London Gateway Port [GBLGP] | 2026-07-07 | Mangalore [INIXE] | 2026-08-23 | 47 days | 1 t/s |
| Grangemouth [GBGRG] | 2026-07-07 | Ennore [INENR] | 2026-08-22 | 46 days | 1 t/s |
| Southampton [GBSOU] | 2026-07-07 | Ennore [INENR] | 2026-08-22 | 46 days | 1 t/s |
| Grangemouth [GBGRG] | 2026-07-07 | Tuticorin [INTUT] | 2026-08-24 | 48 days | 2 t/s |
| London Gateway Port [GBLGP] | 2026-07-07 | Tuticorin [INTUT] | 2026-08-17 | 41 days | 1 t/s |
| Liverpool [GBLIV] | 2026-07-09 | Tuticorin [INTUT] | 2026-08-31 | 53 days | 2 t/s |
| Southampton [GBSOU] | 2026-07-10 | Tuticorin [INTUT] | 2026-08-31 | 52 days | 2 t/s |
| Grangemouth [GBGRG] | 2026-07-14 | Ennore [INENR] | 2026-08-29 | 46 days | 1 t/s |
| Grangemouth [GBGRG] | 2026-07-14 | Tuticorin [INTUT] | 2026-08-31 | 48 days | 2 t/s |
| Southampton [GBSOU] | 2026-07-15 | Ennore [INENR] | 2026-08-29 | 45 days | 1 t/s |
| London Gateway Port [GBLGP] | 2026-07-15 | Ennore [INENR] | 2026-08-22 | 38 days | Direct |
| London Gateway Port [GBLGP] | 2026-07-15 | Tuticorin [INTUT] | 2026-08-24 | 40 days | 1 t/s |
| Southampton [GBSOU] | 2026-07-21 | Ennore [INENR] | 2026-09-05 | 46 days | 1 t/s |
| Grangemouth [GBGRG] | 2026-07-21 | Ennore [INENR] | 2026-09-05 | 46 days | 1 t/s |
| London Gateway Port [GBLGP] | 2026-07-22 | Ennore [INENR] | 2026-08-29 | 38 days | Direct |
| London Gateway Port [GBLGP] | 2026-07-22 | Tuticorin [INTUT] | 2026-08-31 | 40 days | 1 t/s |
| Grangemouth [GBGRG] | 2026-07-28 | Ennore [INENR] | 2026-09-12 | 46 days | 1 t/s |
| Southampton [GBSOU] | 2026-07-29 | Ennore [INENR] | 2026-09-12 | 45 days | 1 t/s |
| London Gateway Port [GBLGP] | 2026-07-29 | Ennore [INENR] | 2026-09-05 | 38 days | Direct |
CMA-CGM
India West Coast
| Origin | Departure | Destination | Arrival | Transit | Routing |
|---|---|---|---|---|---|
| Southampton [GBSOU] | 2026-07-02 | Mundra [INMUN] | 2026-08-28 | 57 days | Direct |
| Southampton [GBSOU] | 2026-07-02 | Nhava Sheva [INNSA] | 2026-08-25 | 54 days | Direct |
| Tilbury [GBTIL] | 2026-07-06 | Nhava Sheva [INNSA] | 2026-08-25 | 50 days | 1 t/s |
India East Coast
| Origin | Departure | Destination | Arrival | Transit | Routing |
|---|---|---|---|---|---|
| Southampton [GBSOU] | 2026-07-03 | Haldia [INHAL] | 2026-08-21 | 49 days | 1 t/s |
| Southampton [GBSOU] | 2026-07-03 | Visakhapatnam [INVTZ] | 2026-08-17 | 45 days | 1 t/s |
| Southampton [GBSOU] | 2026-07-10 | Haldia [INHAL] | 2026-08-27 | 48 days | 1 t/s |
| Southampton [GBSOU] | 2026-07-10 | Visakhapatnam [INVTZ] | 2026-08-24 | 45 days | 1 t/s |
| Southampton [GBSOU] | 2026-07-14 | Haldia [INHAL] | 2026-08-27 | 44 days | 1 t/s |
India South Coast
| Origin | Departure | Destination | Arrival | Transit | Routing |
|---|---|---|---|---|---|
| Liverpool [GBLIV] | 2026-07-06 | Tuticorin [INTUT] | 2026-08-30 | 55 days | 2 t/s |
| Felixstowe [GBFXT] | 2026-07-09 | Cochin [INCOK] | 2026-08-29 | 51 days | 1 t/s |
| London Gateway Port [GBLGP] | 2026-07-09 | Cochin [INCOK] | 2026-08-29 | 51 days | 2 t/s |
| Felixstowe [GBFXT] | 2026-07-09 | Mangalore [INIXE] | 2026-08-30 | 52 days | 1 t/s |
| Felixstowe [GBFXT] | 2026-07-09 | Tuticorin [INTUT] | 2026-08-30 | 52 days | 1 t/s |
| Felixstowe [GBFXT] | 2026-07-15 | Cochin [INCOK] | 2026-08-29 | 45 days | 1 t/s |
| Felixstowe [GBFXT] | 2026-07-15 | Mangalore [INIXE] | 2026-08-30 | 46 days | 1 t/s |
| Felixstowe [GBFXT] | 2026-07-15 | Tuticorin [INTUT] | 2026-08-30 | 46 days | 1 t/s |
| London Gateway Port [GBLGP] | 2026-07-16 | Cochin [INCOK] | 2026-08-29 | 44 days | 2 t/s |
Frequently Asked Questions
What is considered project cargo?
Project cargo typically refers to shipments that are oversized, overweight, or require specialised handling due to their dimensions or nature. This often includes industrial equipment, machinery, and construction materials.
How do you handle out-of-gauge (OOG) cargo?
We handle OOG cargo by using flat rack containers or platforms, carefully securing the cargo to ensure safe transport. Our team assesses the dimensions and weight of the cargo to determine the most appropriate method of securing and transporting it.
What documentation is required for international shipping?
Required documentation typically includes a commercial invoice, packing list, bill of lading, and any necessary permits or licenses. We assist our clients in preparing and obtaining the required documentation to ensure smooth customs clearance.
How do you ensure the safety of heavy lift cargo during transport?
We ensure the safety of heavy lift cargo through careful planning, risk assessment, and the use of specialised equipment. Our team conducts route surveys, assesses potential hazards, and employs appropriate lifting and securing techniques to minimise the risk of damage or accidents.
Do you offer insurance for project cargo shipments?
Yes, we offer cargo insurance options to protect your shipments against loss or damage during transit. Our team can provide information on available insurance coverage and assist you in selecting the right policy for your needs.
What is the typical transit time for shipping to Solapur, Maharashtra?
Transit times vary depending on the origin, mode of transport, and specific requirements of the shipment. We provide estimated transit times based on the specific details of your cargo and destination.
How can I track my shipment?
We provide real-time tracking services, allowing you to monitor the progress of your shipment throughout its journey. You will receive regular updates on the location and status of your cargo.
What are the customs regulations for importing goods into India?
Customs regulations in India can be complex and vary depending on the type of goods being imported. We have expertise in Indian customs regulations and can assist you in navigating the requirements for importing your cargo into Solapur, Maharashtra.
What payment methods do you accept?
We accept various payment methods, including bank transfers, letters of credit, and other standard payment options. Our team can provide details on accepted payment methods and assist you in arranging payment for your shipment.
