Shipping Flat-Racks to Junagadh, Gujarat: Heavy Lift & Project Cargo Solutions
Shipping International specialises in the transportation of oversized, out-of-gauge (OOG), and heavy lift cargo, ensuring a streamlined, secure, and punctual delivery service worldwide. With considerable experience in managing intricate logistical challenges, we are a dependable partner for moving substantial, heavy, and non-standard cargo across international borders.
Advantages of Selecting Our Heavy Lift & Project Cargo Services
- Expertise in Complex Logistics: Our team comprises seasoned professionals adept at managing large and complex cargo operations. Whether it involves construction equipment, industrial machinery, or specialised materials, we deliver bespoke logistics strategies tailored to your specific requirements.
- Bespoke Solutions for Each Project: Recognising the uniqueness of each project, we dedicate time to understanding your needs. We conduct feasibility studies, route surveys, and compliance checks to provide optimal logistics solutions. Our tailored approach ensures the secure and efficient transit of your cargo.
- Integrated Planning and Coordination: From initial planning to final delivery, we meticulously coordinate every aspect. This includes route assessments, port logistics, customs brokerage, and regulatory compliance. Our end-to-end project management guarantees smooth transportation, mitigating unnecessary delays.
- Advanced Equipment and Technology: We utilise advanced lifting equipment, flat racks, open-top containers, and specialised vessels to manage even the most demanding loads. Our teams employ modern tools, such as 3D modelling for stowage and lashing planning, ensuring the safe transportation of every shipment.
- Global Network for Seamless Delivery: Our extensive global network of trusted partners and agents ensures accessibility to even the most remote destinations. Your cargo benefits from seamless connectivity and real-time tracking, providing you with up-to-date information at every stage.
Our Heavy Lift & Project Cargo Services Encompass:
- End-to-End Project Management
- Customs Brokerage & Compliance
- Specialised Equipment Handling
- Risk Assessment & Mitigation
- Door-to-Door Services
Industries Served:
- Construction & Infrastructure
- Energy (Oil & Gas, Renewables)
- Manufacturing & Industrial
- Mining & Minerals
- Technology & Electronics
Project Cargo Types Handled:
- Out of Gauge Cargo (OOG): Cargo exceeding standard container dimensions is carefully loaded and secured on flat racks or platforms.
- Breakbulk Solutions: For items unsuitable for containerisation, we employ breakbulk solutions, securing cargo on specialised beds with multiple flat racks, ensuring adherence to international maritime safety codes.
- Heavy Lift Cargo: Our team manages extremely heavy loads, including machinery, construction materials, and oversized equipment.
Sustainability Initiatives:
We are dedicated to minimising the environmental impact of logistics. Through our CO2 emissions calculator, we assist clients in monitoring and improving the carbon footprint of their shipments.
Maersk
India West Coast
| Origin | Departure | Destination | Arrival | Transit | Routing |
|---|---|---|---|---|---|
| Liverpool [GBLIV] | 2026-07-02 | Mundra [INMUN] | 2026-08-17 | 46 days | 2 t/s |
| Liverpool [GBLIV] | 2026-07-02 | Pipavav Port [INPAV] | 2026-08-18 | 47 days | 2 t/s |
| Liverpool [GBLIV] | 2026-07-02 | Hazira [INHZA] | 2026-08-17 | 46 days | 2 t/s |
| Liverpool [GBLIV] | 2026-07-02 | Nhava Sheva [INNSA] | 2026-08-16 | 45 days | 2 t/s |
| Southampton [GBSOU] | 2026-07-03 | Pipavav Port [INPAV] | 2026-08-18 | 46 days | 2 t/s |
| Southampton [GBSOU] | 2026-07-03 | Nhava Sheva [INNSA] | 2026-08-16 | 44 days | 2 t/s |
| Southampton [GBSOU] | 2026-07-03 | Mundra [INMUN] | 2026-08-17 | 45 days | 2 t/s |
| Southampton [GBSOU] | 2026-07-03 | Hazira [INHZA] | 2026-08-17 | 45 days | 2 t/s |
| London Gateway Port [GBLGP] | 2026-07-04 | Pipavav Port [INPAV] | 2026-08-18 | 45 days | 1 t/s |
| London Gateway Port [GBLGP] | 2026-07-04 | Hazira [INHZA] | 2026-08-10 | 37 days | 1 t/s |
| London Gateway Port [GBLGP] | 2026-07-04 | Nhava Sheva [INNSA] | 2026-08-13 | 40 days | Direct |
| London Gateway Port [GBLGP] | 2026-07-07 | Mundra [INMUN] | 2026-08-22 | 46 days | 1 t/s |
| Grangemouth [GBGRG] | 2026-07-07 | Hazira [INHZA] | 2026-08-24 | 48 days | 2 t/s |
| Grangemouth [GBGRG] | 2026-07-07 | Pipavav Port [INPAV] | 2026-08-25 | 49 days | 2 t/s |
| Grangemouth [GBGRG] | 2026-07-07 | Nhava Sheva [INNSA] | 2026-08-23 | 47 days | 2 t/s |
| Grangemouth [GBGRG] | 2026-07-07 | Mundra [INMUN] | 2026-08-24 | 48 days | 2 t/s |
| Liverpool [GBLIV] | 2026-07-09 | Mundra [INMUN] | 2026-08-24 | 46 days | 2 t/s |
| Liverpool [GBLIV] | 2026-07-09 | Nhava Sheva [INNSA] | 2026-08-23 | 45 days | 2 t/s |
| Liverpool [GBLIV] | 2026-07-09 | Pipavav Port [INPAV] | 2026-08-25 | 47 days | 2 t/s |
| Liverpool [GBLIV] | 2026-07-09 | Hazira [INHZA] | 2026-08-24 | 46 days | 2 t/s |
| Southampton [GBSOU] | 2026-07-10 | Mundra [INMUN] | 2026-08-24 | 45 days | 2 t/s |
| Southampton [GBSOU] | 2026-07-10 | Nhava Sheva [INNSA] | 2026-08-23 | 44 days | 2 t/s |
| Southampton [GBSOU] | 2026-07-10 | Hazira [INHZA] | 2026-08-24 | 45 days | 2 t/s |
| Southampton [GBSOU] | 2026-07-10 | Pipavav Port [INPAV] | 2026-08-25 | 46 days | 2 t/s |
| London Gateway Port [GBLGP] | 2026-07-11 | Nhava Sheva [INNSA] | 2026-08-20 | 40 days | Direct |
| London Gateway Port [GBLGP] | 2026-07-11 | Pipavav Port [INPAV] | 2026-08-25 | 45 days | 1 t/s |
| London Gateway Port [GBLGP] | 2026-07-11 | Hazira [INHZA] | 2026-08-17 | 37 days | 1 t/s |
| Grangemouth [GBGRG] | 2026-07-14 | Pipavav Port [INPAV] | 2026-09-01 | 49 days | 2 t/s |
| Grangemouth [GBGRG] | 2026-07-14 | Hazira [INHZA] | 2026-08-31 | 48 days | 2 t/s |
| Grangemouth [GBGRG] | 2026-07-14 | Mundra [INMUN] | 2026-08-31 | 48 days | 2 t/s |
| Grangemouth [GBGRG] | 2026-07-14 | Nhava Sheva [INNSA] | 2026-08-30 | 47 days | 2 t/s |
| London Gateway Port [GBLGP] | 2026-07-15 | Mundra [INMUN] | 2026-08-29 | 45 days | 1 t/s |
| Liverpool [GBLIV] | 2026-07-16 | Hazira [INHZA] | 2026-08-31 | 46 days | 2 t/s |
| Liverpool [GBLIV] | 2026-07-16 | Mundra [INMUN] | 2026-08-31 | 46 days | 2 t/s |
| Liverpool [GBLIV] | 2026-07-16 | Nhava Sheva [INNSA] | 2026-08-30 | 45 days | 2 t/s |
| Liverpool [GBLIV] | 2026-07-16 | Pipavav Port [INPAV] | 2026-09-01 | 47 days | 2 t/s |
| Southampton [GBSOU] | 2026-07-17 | Hazira [INHZA] | 2026-08-31 | 45 days | 2 t/s |
| Southampton [GBSOU] | 2026-07-17 | Mundra [INMUN] | 2026-08-31 | 45 days | 2 t/s |
| Southampton [GBSOU] | 2026-07-17 | Nhava Sheva [INNSA] | 2026-08-30 | 44 days | 2 t/s |
| Southampton [GBSOU] | 2026-07-17 | Pipavav Port [INPAV] | 2026-09-01 | 46 days | 2 t/s |
| London Gateway Port [GBLGP] | 2026-07-18 | Pipavav Port [INPAV] | 2026-09-01 | 45 days | 1 t/s |
| London Gateway Port [GBLGP] | 2026-07-18 | Nhava Sheva [INNSA] | 2026-08-27 | 40 days | Direct |
| London Gateway Port [GBLGP] | 2026-07-18 | Hazira [INHZA] | 2026-08-24 | 37 days | 1 t/s |
| Grangemouth [GBGRG] | 2026-07-21 | Mundra [INMUN] | 2026-08-31 | 41 days | 2 t/s |
| Grangemouth [GBGRG] | 2026-07-21 | Nhava Sheva [INNSA] | 2026-08-30 | 40 days | 2 t/s |
| Grangemouth [GBGRG] | 2026-07-21 | Pipavav Port [INPAV] | 2026-09-01 | 42 days | 2 t/s |
| Grangemouth [GBGRG] | 2026-07-21 | Hazira [INHZA] | 2026-08-31 | 41 days | 2 t/s |
| London Gateway Port [GBLGP] | 2026-07-22 | Mundra [INMUN] | 2026-09-05 | 45 days | 1 t/s |
| Liverpool [GBLIV] | 2026-07-23 | Mundra [INMUN] | 2026-09-07 | 46 days | 2 t/s |
| Liverpool [GBLIV] | 2026-07-23 | Nhava Sheva [INNSA] | 2026-09-06 | 45 days | 2 t/s |
| Liverpool [GBLIV] | 2026-07-23 | Pipavav Port [INPAV] | 2026-09-08 | 47 days | 2 t/s |
| Liverpool [GBLIV] | 2026-07-23 | Hazira [INHZA] | 2026-09-07 | 46 days | 2 t/s |
| Southampton [GBSOU] | 2026-07-24 | Nhava Sheva [INNSA] | 2026-09-06 | 44 days | 2 t/s |
| Southampton [GBSOU] | 2026-07-24 | Hazira [INHZA] | 2026-09-07 | 45 days | 2 t/s |
| Southampton [GBSOU] | 2026-07-24 | Mundra [INMUN] | 2026-09-07 | 45 days | 2 t/s |
| Southampton [GBSOU] | 2026-07-24 | Pipavav Port [INPAV] | 2026-09-08 | 46 days | 2 t/s |
| London Gateway Port [GBLGP] | 2026-07-25 | Nhava Sheva [INNSA] | 2026-09-03 | 40 days | Direct |
| London Gateway Port [GBLGP] | 2026-07-25 | Pipavav Port [INPAV] | 2026-09-08 | 45 days | 1 t/s |
| London Gateway Port [GBLGP] | 2026-07-25 | Hazira [INHZA] | 2026-08-31 | 37 days | 1 t/s |
| Grangemouth [GBGRG] | 2026-07-28 | Pipavav Port [INPAV] | 2026-09-08 | 42 days | 2 t/s |
| Grangemouth [GBGRG] | 2026-07-28 | Mundra [INMUN] | 2026-09-07 | 41 days | 2 t/s |
| Grangemouth [GBGRG] | 2026-07-28 | Nhava Sheva [INNSA] | 2026-09-06 | 40 days | 2 t/s |
| Grangemouth [GBGRG] | 2026-07-28 | Hazira [INHZA] | 2026-09-07 | 41 days | 2 t/s |
| London Gateway Port [GBLGP] | 2026-07-29 | Mundra [INMUN] | 2026-09-19 | 52 days | 1 t/s |
India East Coast
| Origin | Departure | Destination | Arrival | Transit | Routing |
|---|---|---|---|---|---|
| Liverpool [GBLIV] | 2026-07-02 | Haldia [INHAL] | 2026-08-28 | 57 days | 2 t/s |
| Liverpool [GBLIV] | 2026-07-02 | Kolkata [INCCU] | 2026-08-30 | 59 days | 2 t/s |
| Southampton [GBSOU] | 2026-07-03 | Haldia [INHAL] | 2026-08-28 | 56 days | 2 t/s |
| Southampton [GBSOU] | 2026-07-03 | Kolkata [INCCU] | 2026-08-30 | 58 days | 2 t/s |
| London Gateway Port [GBLGP] | 2026-07-07 | Haldia [INHAL] | 2026-08-28 | 52 days | 1 t/s |
| London Gateway Port [GBLGP] | 2026-07-07 | Kolkata [INCCU] | 2026-08-23 | 47 days | 1 t/s |
| London Gateway Port [GBLGP] | 2026-07-07 | Visakhapatnam [INVTZ] | 2026-08-19 | 43 days | 1 t/s |
| Grangemouth [GBGRG] | 2026-07-07 | Haldia [INHAL] | 2026-08-28 | 52 days | 2 t/s |
| Grangemouth [GBGRG] | 2026-07-07 | Kolkata [INCCU] | 2026-08-30 | 54 days | 2 t/s |
| Liverpool [GBLIV] | 2026-07-09 | Kolkata [INCCU] | 2026-09-06 | 59 days | 2 t/s |
| Liverpool [GBLIV] | 2026-07-09 | Haldia [INHAL] | 2026-09-02 | 55 days | 2 t/s |
| Southampton [GBSOU] | 2026-07-10 | Kolkata [INCCU] | 2026-09-06 | 58 days | 2 t/s |
| Southampton [GBSOU] | 2026-07-10 | Haldia [INHAL] | 2026-09-02 | 54 days | 2 t/s |
| Grangemouth [GBGRG] | 2026-07-14 | Haldia [INHAL] | 2026-09-02 | 50 days | 2 t/s |
| Grangemouth [GBGRG] | 2026-07-14 | Kolkata [INCCU] | 2026-09-06 | 54 days | 2 t/s |
| London Gateway Port [GBLGP] | 2026-07-15 | Kolkata [INCCU] | 2026-08-30 | 46 days | 1 t/s |
| London Gateway Port [GBLGP] | 2026-07-15 | Haldia [INHAL] | 2026-08-28 | 44 days | 1 t/s |
| London Gateway Port [GBLGP] | 2026-07-22 | Kolkata [INCCU] | 2026-09-06 | 46 days | 1 t/s |
| London Gateway Port [GBLGP] | 2026-07-22 | Haldia [INHAL] | 2026-09-02 | 42 days | 1 t/s |
India South Coast
| Origin | Departure | Destination | Arrival | Transit | Routing |
|---|---|---|---|---|---|
| Southampton [GBSOU] | 2026-07-01 | Ennore [INENR] | 2026-08-15 | 45 days | 1 t/s |
| Liverpool [GBLIV] | 2026-07-02 | Tuticorin [INTUT] | 2026-08-24 | 53 days | 2 t/s |
| Southampton [GBSOU] | 2026-07-03 | Tuticorin [INTUT] | 2026-08-24 | 52 days | 2 t/s |
| London Gateway Port [GBLGP] | 2026-07-07 | Cochin [INCOK] | 2026-08-21 | 45 days | 1 t/s |
| London Gateway Port [GBLGP] | 2026-07-07 | Ennore [INENR] | 2026-08-15 | 39 days | Direct |
| London Gateway Port [GBLGP] | 2026-07-07 | Mangalore [INIXE] | 2026-08-23 | 47 days | 1 t/s |
| Grangemouth [GBGRG] | 2026-07-07 | Ennore [INENR] | 2026-08-22 | 46 days | 1 t/s |
| Southampton [GBSOU] | 2026-07-07 | Ennore [INENR] | 2026-08-22 | 46 days | 1 t/s |
| Grangemouth [GBGRG] | 2026-07-07 | Tuticorin [INTUT] | 2026-08-24 | 48 days | 2 t/s |
| London Gateway Port [GBLGP] | 2026-07-07 | Tuticorin [INTUT] | 2026-08-17 | 41 days | 1 t/s |
| Liverpool [GBLIV] | 2026-07-09 | Tuticorin [INTUT] | 2026-08-31 | 53 days | 2 t/s |
| Southampton [GBSOU] | 2026-07-10 | Tuticorin [INTUT] | 2026-08-31 | 52 days | 2 t/s |
| Grangemouth [GBGRG] | 2026-07-14 | Ennore [INENR] | 2026-08-29 | 46 days | 1 t/s |
| Grangemouth [GBGRG] | 2026-07-14 | Tuticorin [INTUT] | 2026-08-31 | 48 days | 2 t/s |
| Southampton [GBSOU] | 2026-07-15 | Ennore [INENR] | 2026-08-29 | 45 days | 1 t/s |
| London Gateway Port [GBLGP] | 2026-07-15 | Ennore [INENR] | 2026-08-22 | 38 days | Direct |
| London Gateway Port [GBLGP] | 2026-07-15 | Tuticorin [INTUT] | 2026-08-24 | 40 days | 1 t/s |
| Southampton [GBSOU] | 2026-07-21 | Ennore [INENR] | 2026-09-05 | 46 days | 1 t/s |
| Grangemouth [GBGRG] | 2026-07-21 | Ennore [INENR] | 2026-09-05 | 46 days | 1 t/s |
| London Gateway Port [GBLGP] | 2026-07-22 | Ennore [INENR] | 2026-08-29 | 38 days | Direct |
| London Gateway Port [GBLGP] | 2026-07-22 | Tuticorin [INTUT] | 2026-08-31 | 40 days | 1 t/s |
| Grangemouth [GBGRG] | 2026-07-28 | Ennore [INENR] | 2026-09-12 | 46 days | 1 t/s |
| Southampton [GBSOU] | 2026-07-29 | Ennore [INENR] | 2026-09-12 | 45 days | 1 t/s |
| London Gateway Port [GBLGP] | 2026-07-29 | Ennore [INENR] | 2026-09-05 | 38 days | Direct |
CMA-CGM
India West Coast
| Origin | Departure | Destination | Arrival | Transit | Routing |
|---|---|---|---|---|---|
| Southampton [GBSOU] | 2026-07-02 | Mundra [INMUN] | 2026-08-28 | 57 days | Direct |
| Southampton [GBSOU] | 2026-07-02 | Nhava Sheva [INNSA] | 2026-08-25 | 54 days | Direct |
| Tilbury [GBTIL] | 2026-07-06 | Nhava Sheva [INNSA] | 2026-08-25 | 50 days | 1 t/s |
India East Coast
| Origin | Departure | Destination | Arrival | Transit | Routing |
|---|---|---|---|---|---|
| Southampton [GBSOU] | 2026-07-03 | Haldia [INHAL] | 2026-08-21 | 49 days | 1 t/s |
| Southampton [GBSOU] | 2026-07-03 | Visakhapatnam [INVTZ] | 2026-08-17 | 45 days | 1 t/s |
| Southampton [GBSOU] | 2026-07-10 | Haldia [INHAL] | 2026-08-27 | 48 days | 1 t/s |
| Southampton [GBSOU] | 2026-07-10 | Visakhapatnam [INVTZ] | 2026-08-24 | 45 days | 1 t/s |
| Southampton [GBSOU] | 2026-07-14 | Haldia [INHAL] | 2026-08-27 | 44 days | 1 t/s |
India South Coast
| Origin | Departure | Destination | Arrival | Transit | Routing |
|---|---|---|---|---|---|
| Liverpool [GBLIV] | 2026-07-06 | Tuticorin [INTUT] | 2026-08-30 | 55 days | 2 t/s |
| Felixstowe [GBFXT] | 2026-07-09 | Cochin [INCOK] | 2026-08-29 | 51 days | 1 t/s |
| London Gateway Port [GBLGP] | 2026-07-09 | Cochin [INCOK] | 2026-08-29 | 51 days | 2 t/s |
| Felixstowe [GBFXT] | 2026-07-09 | Mangalore [INIXE] | 2026-08-30 | 52 days | 1 t/s |
| Felixstowe [GBFXT] | 2026-07-09 | Tuticorin [INTUT] | 2026-08-30 | 52 days | 1 t/s |
| Felixstowe [GBFXT] | 2026-07-15 | Cochin [INCOK] | 2026-08-29 | 45 days | 1 t/s |
| Felixstowe [GBFXT] | 2026-07-15 | Mangalore [INIXE] | 2026-08-30 | 46 days | 1 t/s |
| Felixstowe [GBFXT] | 2026-07-15 | Tuticorin [INTUT] | 2026-08-30 | 46 days | 1 t/s |
| London Gateway Port [GBLGP] | 2026-07-16 | Cochin [INCOK] | 2026-08-29 | 44 days | 2 t/s |
Frequently Asked Questions
What is considered project cargo?
Project cargo typically refers to oversized, overweight, or high-value goods that require specialised handling and transportation due to their dimensions, weight, or complexity. This often includes equipment for construction, energy, manufacturing, and other large-scale projects.
What are out-of-gauge (OOG) shipments?
Out-of-gauge (OOG) shipments are cargo that exceeds the standard dimensions of shipping containers. These items often require flat rack or open-top containers and specialised handling procedures to ensure safe and secure transport.
How do you ensure the safety of heavy lift cargo?
We ensure the safety of heavy lift cargo through meticulous planning, including route surveys, risk assessments, and the use of specialised lifting equipment and securing techniques. Our experienced team adheres to strict safety protocols and international maritime safety codes.
What customs documentation is required for shipping to Junagadh?
Customs documentation requirements vary depending on the specific cargo and applicable regulations. Generally, you will need a commercial invoice, packing list, bill of lading, certificate of origin, and any other permits or licenses required by Indian customs authorities. We provide customs brokerage services to assist with this process.
How long does it take to ship project cargo from the UK to Junagadh?
The transit time for project cargo from the UK to Junagadh depends on various factors, including the specific route, mode of transport, and customs clearance procedures. Typically, it can take several weeks to a few months. We provide estimated transit times during the planning phase.
Do you offer insurance for project cargo shipments?
Yes, we offer cargo insurance options to protect your valuable shipments against loss or damage during transit. Our insurance coverage can be tailored to meet your specific needs and provide peace of mind.
What is a flat rack container, and when is it used?
A flat rack container is a type of shipping container with collapsible sides, allowing for the transport of oversized or unusually shaped cargo that cannot fit within standard containers. They are commonly used for machinery, vehicles, and other large items.
How can I get a quote for shipping project cargo?
To obtain a quote for shipping project cargo, please contact us via email with details of your cargo, including dimensions, weight, origin, destination, and any specific requirements. We will provide you with a competitive and tailored quotation.