How To Ship Shipbuilding Assembly Jigs

 

Ship a shipbuilding assembly jig? Our guide covers choosing the right shipping method (breakbulk, OOG container, heavy lift), finding a reputable freight forwarder, securing permits, packaging, port selection, and more. Get expert advice for a smooth process.

 

 

Shipping a Shipbuilding Assembly Jig: A Comprehensive Guide

I. Assessing the Cargo

  • Precise dimensions (L x W x H)
  • Weight
  • Center of gravity
  • Material composition
  • Load-bearing points
  • Fragile components
  • Detailed cargo manifest
  • Drawings & specifications

Precisely determine the jig's dimensions, weight, center of gravity, material composition, load-bearing points, and any fragile components. Create a detailed cargo manifest including all relevant information. Detailed drawings and specifications are crucial for a smooth shipping process. Accurate measurements are paramount to avoid delays and complications.

II. Choosing a Shipping Method

  • Breakbulk: Suitable for extremely large jigs. Involves chartering space on a vessel. Advantages include accommodating virtually any size. Disadvantages include high costs, longer transit times, and less frequent sailings.
  • Outsized (OOG) Container: Possible if the jig can be partially disassembled or a specialized oversized container is used. Offers a relatively standardized approach, potentially faster than Breakbulk. Size limitations exist, and specialized handling may be required.
  • Heavy Lift: Necessary for exceptionally heavy jigs. Requires specialized cranes and vessels. Handles the heaviest and largest items effectively but comes with a very high cost and limited vessel availability.

III. Selecting a Freight Forwarder

  • Experience in OOG/heavy lift
  • Strong UK port operations track record
  • Relevant certifications
  • Comprehensive insurance coverage
  • Excellent client references

Shipping International offers expertise in handling complex shipments.

IV. Securing Permits & Documentation

  • Export/import licenses
  • Customs documentation (commercial invoice, packing list, certificate of origin)
  • Special permits for oversized/heavy cargo

Obtain all required export/import licenses, customs documentation, and any special permits. Proactive preparation is key to avoiding delays.

V. Packaging & Crating

  • Robust, seaworthy packaging (plywood or steel)
  • Custom-built crates
  • Specialized dunnage
  • Weatherproofing
  • Ventilation

The jig requires robust, seaworthy packaging. Proper ventilation is critical to prevent damage.

VI. Port Selection & Handling

  • Suitable ports (crane capacity, quayside access, storage)
  • Pre-arrival notifications
  • Heavy-lift equipment arrangements

Identify suitable ports of origin and destination with facilities to handle OOG/Heavy Lift Cargo. Careful port selection is crucial for operational efficiency.

VII. Transportation to Port

  • Specialized transport (lowboy trailers)
  • Permits for oversized loads

Arrange specialized transport for moving the jig from the Manufacturing site to the port.

VIII. Loading & Lashing

Supervise the loading process to ensure the jig is securely lashed and braced according to international standards.

IX. Insurance

Obtain comprehensive cargo insurance, such as all-risks or Institute Cargo Clauses, to cover potential damage or loss during transit.

X. Tracking & Delivery

  • Shipment tracking
  • Communication with all parties

Monitor the shipment's progress and maintain clear communication with all parties involved.

XI. Important Considerations

  • Cost: OOG/heavy lift shipments are expensive.
  • Lead Time: Allow ample time for planning.
  • Risk Assessment: Consider weather, handling, and theft.

XII. Potential Problems & Solutions

  • Customs Delays: Ensure all documentation is accurate and complete. Work with a customs broker if needed.
  • Damaged Goods: Use robust packaging and ensure proper lashing. Comprehensive insurance is crucial.
  • Port Congestion: Choose ports with efficient handling and consider alternative ports if necessary.
  • Vessel Delays: Build buffer time into your schedule. Consider using a vessel with a good on-time performance record.

Shipping International provides logistics expertise.

Shipping International Contact Information:

Logistics Expert, Shipping International
shippinginternational.co.uk
This email address is being protected from spambots. You need JavaScript enabled to view it.
Tel: 0330 027 0450