How To Ship Prefabricated Solar Farms

 

Expert guide to shipping prefabricated solar farms internationally. Covers planning, packaging, transport, customs, and insurance.

 

 

Shipping a Prefabricated Solar Farm

Planning & Assessment

Detailed Inventory

Create a comprehensive list of every component, noting precise dimensions (length, width, height), weight, and material. Include packaging details for each item. Accurate measurements are crucial for efficient shipping.

Port Survey

Thoroughly assess the destination port's capabilities. This includes crane capacity, handling equipment, storage space, infrastructure limitations, tidal restrictions, and potential congestion. Pre-shipment inspections are highly recommended.

Route Survey

Identify the optimal shipping route, considering vessel availability and transit times. Explore sea freight, or a combination of sea and land/rail transport (intermodal). Compare transit times and costs.

Risk Assessment

Conduct a thorough risk assessment, identifying potential hazards such as severe weather, damage during transit, delays, and theft. Develop mitigation strategies, including insurance, GPS tracking, and security personnel.

Cargo Plan

Develop a detailed cargo plan outlining packaging, handling, securing, and stowage procedures. Specify required equipment (cranes, slings). Include diagrams illustrating optimal component placement and weight distribution.

Packaging & Securing

Packaging

Use robust packaging appropriate for each component's size, weight, and fragility. Weatherproofing is essential. Specify recommended materials (plywood crates, steel frames, protective films).

Securing

Secure components using appropriate lashing, bracing, and dunnage. Adherence to international standards (e.g., ISO 6346) is crucial. Include diagrams illustrating correct lashing techniques and specify required materials.

Transportation Method Selection

Transportation Options

Consider these options:

  • Heavy-lift vessels: For extremely large or heavy components.
  • Flat rack containers: For oversized components.
  • Conventional Breakbulk: For items too large or awkwardly shaped for containers or flat racks.
  • FCL (Full Container Load): For smaller, standard-sized components.

A comparison table outlining cost, speed, capacity, and suitability of each method should be included.

Documentation

Required Documents

Ensure all necessary documentation is prepared. This includes:

  • Packing List
  • Commercial Invoice
  • Bill of Lading
  • Certificate of Origin
  • Insurance Documents
  • Permits & Licenses (where applicable)
  • OOG (Oversized or Out-of-Gauge) Cargo Declaration (if necessary)

Customs Clearance

Import/Export Compliance

Ensure full compliance with all customs regulations and import/export requirements. Prepare and submit all necessary customs documentation. Shipping International can assist with this process.

Delivery & Installation

On-site Management

Supervise cargo offloading and handling at the destination port. Coordinate with local contractors for delivery and installation. Shipping International offers on-site management services.

Insurance

Cargo Insurance Options

Explore cargo insurance options, such as all-risks coverage and Institute Cargo Clauses. Shipping International can advise on appropriate insurance.

Unlock Global Reach with Expert Shipping Support

We understand the complexities of international shipping. Let us help you navigate them. 

Start the Conversation Today.