How To Ship Prefabricated Cooling Tunnels

 

Shipping prefabricated cooling tunnels (OOG cargo)? UK logistics experts Shipping International provide comprehensive solutions, from pre-shipment planning & route surveys to customs clearance & on-site installation. Contact us today!

 

 

Shipping Prefabricated Cooling Tunnels (OOG Cargo) from/to the UK

Pre-Shipment Planning

Detailed Dimensions & Weight

  • Obtain precise measurements (length, width, height, and weight) of each tunnel section.
  • Include the centre of gravity data for each section.
  • Provide detailed drawings and specifications.

Port Survey

  • Assess crane capacity, quayside space, and road access limitations at origin and destination ports.

Route Survey

  • Plan the optimal land transport route, considering weight limits, bridge clearances, and turning radii.

Packaging & Securing

  • Design robust packaging to protect tunnel sections during transit.

Lifting Equipment

  • Specify required lifting equipment (cranes, forklifts) at each stage, including capacities and reach.

Insurance

Documentation

  • Prepare necessary documentation, including commercial invoice, packing list, bill of lading (B/L), certificate of origin, weight and dimension certificates, port authority permits, insurance certificate, and drawings/specifications.

Environmental Considerations

Regulations and Impact Assessments

  • Comply with all relevant environmental regulations.
  • Conduct necessary impact assessments to minimize the environmental footprint.
  • Secure any required environmental permits.

Transportation

Sea Freight

  • Sea freight is usually most suitable for long distances. Breakbulk shipment is probable.

Road Haulage

  • Specialised low-bed trailers and heavy-lift vehicles are required for land transport.

Port Handling

  • Shipping International arranges for experienced stevedores and heavy-lift operators at both origin and destination ports.

Customs & Compliance

Customs Clearance

  • Ensure all necessary customs documentation is prepared and submitted in advance.

On-Site Delivery & Installation

Site Survey

  • Conduct a site survey at the destination to ensure adequate space and access for unloading and installation.

Lifting & Placement

  • Utilise appropriate heavy-lift equipment for precise placement of the tunnel sections.

Assembly

  • Coordinate the assembly of the tunnel sections according to the manufacturer's instructions.

Contingency Planning

Risk Assessment & Emergency Procedures

  • Identify potential risks, develop mitigation strategies, and establish clear emergency procedures.

Cost Breakdown

Information on cost breakdowns is available from Shipping International.

Timeline & Milestones

Information on project timelines is available from Shipping International.

Contact Information

Shipping International provides logistics expertise in the UK. Contact details are available on their website, shippinginternational.co.uk

Unlock Global Reach with Expert Shipping Support

We understand the complexities of international shipping. Let us help you navigate them. 

Start the Conversation Today.