How To Ship Industrial Sintering Furnaces

 

Ship industrial sintering furnaces worldwide with Shipping International. Experts in OOG/breakbulk cargo, we handle all aspects: permits, documentation, packaging, and customs clearance. Get a free quote today!

 

 

Shipping Industrial Sintering Furnaces from/to the UK

Assess the Furnace

Detailed Checklist:

  • Precise Dimensions (Length, Width, Height): Include measurements to the nearest centimeter.
  • Weight: Specify gross weight and center of gravity.
  • Materials of construction: List all materials for customs declarations.
  • Hazardous Materials: Identify any hazardous components (e.g., asbestos, specific chemicals) and obtain necessary certifications. Failure to declare hazardous materials can lead to significant delays and penalties.
  • Photographs: Multiple photos from various angles, clearly showing all sides and any identifying marks.

Select the Right Shipping Method

Options:

  • Breakbulk: For furnaces exceeding heavy-lift vessel capacity (typically exceeding 500 tonnes). Expect higher costs and longer transit times. This method involves shipping the furnace as individual, unpackaged units.
  • OOG (Out of Gauge): For furnaces within heavy-lift vessel limits but exceeding standard container dimensions. Requires specialized handling equipment and careful planning to ensure safe transport.
  • FCL (Full Container Load): Extremely rare for industrial sintering furnaces due to size. While theoretically possible for smaller furnaces, it's highly improbable.

Cost & Transit Time Comparison (Estimates):

Method Cost Transit Time
Breakbulk High Long (4-8 weeks)
OOG Medium-High Medium (2-4 weeks)
FCL N/A (unlikely) N/A

Detailed Cost Breakdown

The total cost will depend on several factors. Costs will include:

Secure Necessary Permits and Documentation

Required Documents:

  • Export License (if required)
  • Commercial Invoice
  • Packing List
  • Bill of Lading
  • Certificate of Origin
  • Dangerous Goods Declaration (if applicable)
  • Import Permits (destination country requirements)

Packaging and Crating

Materials & Techniques:

  • ISPM-15 compliant wood packaging
  • Steel bracing and reinforcement
  • Shock-absorbing materials (e.g., foam, bubble wrap)
  • Weatherproofing (e.g., tarpaulins)

Port Selection

UK Ports with Heavy-Lift Capabilities:

Several UK ports offer heavy-lift capabilities.

Vessel Selection

Factors to Consider:

  • Vessel Capacity (weight and dimensions)
  • Route and Schedule
  • Carrier Reputation and Reliability
  • Insurance Coverage Offered by Carrier

Securement

Techniques:

Proper securement is crucial to prevent damage during transit.

Transportation to Port

Permits for Oversized Loads:

Loading and Unloading

Safety Protocols:

Insurance

Coverage Options:

  • All-Risks
  • Institute Cargo Clauses (A, B, or C)

Tracking and Monitoring

Technologies:

  • GPS Tracking
  • Online Portals

Customs Clearance

Checklist:

Troubleshooting

Potential Problems and Solutions:

  • Damaged Furnace During Transit
  • Delays Due to Unforeseen Circumstances (Weather, Port Congestion)
  • Missing Documentation
  • Customs Issues

Important Considerations

Risk Assessment:

Experienced Logistics Provider:

Shipping International

Communication:

Delays and Contingency Planning:

Glossary of Terms

  • OOG (Out of Gauge)
  • FCL (Full Container Load)
  • ISPM-15
  • Bill of Lading

Contact Information

Shipping International

This email address is being protected from spambots. You need JavaScript enabled to view it.

Tel: 0330 027 0450

Unlock Global Reach with Expert Shipping Support

We understand the complexities of international shipping. Let us help you navigate them. 

Start the Conversation Today.

Industries

Construction & Infrastructure Machinery
Energy & Renewables Logistics
Chemical Logistics
Technology & Electronics
Aerospace
Image