How To Ship Industrial Incinerators

 

Guide to shipping industrial incinerators from/to the UK. Expert advice on assessment, packaging, documentation, transportation & customs clearance. Contact Shipping International for assistance.

 

 

Shipping Industrial Incinerators from/to the UK

Assessment & Planning

Dimensions & Weight

Precise measurements (length, width, height, weight) and centre of gravity calculations are essential. Detailed drawings are required.

Destination Port

Specify the precise port of loading and discharge, ensuring accessibility for heavy-lift equipment is considered.

Pre-Shipment Survey

A pre-shipment survey by a qualified surveyor is necessary to verify dimensions and assess the incinerator's condition.

Shipping Method

The optimal shipping method (FCL, OOG, Breakbulk) depends on size and weight. Most incinerators will require OOG or Breakbulk shipping.

Route Planning

Efficient route planning is crucial, considering transit times and potential restrictions such as canal size and bridge clearances.

Environmental Regulations

Permits and Compliance

Shipping incinerators requires adherence to stringent environmental regulations. Permits may be needed for the transport of hazardous materials, waste disposal, and to mitigate potential air and sea pollution. Compliance with MARPOL (International Convention for the Prevention of Pollution from Ships) and other relevant international and national regulations is mandatory. Specific requirements vary by country and the type of incinerator.

Packaging & Securing

Crating/Protection

Robust protection against transit damage is vital. This may involve custom-built crates, specialised padding, and weatherproofing.

Lifting Points

Clearly marked designated lifting points ensure safe handling by heavy-lift equipment.

Securing to Platform

Secure the incinerator firmly to a flat rack or Breakbulk platform using appropriate lashing materials and techniques. Additional bracing may be necessary for enhanced stability.

Documentation

Detailed Specifications

Comprehensive documentation is required, including dimensions, weight, centre of gravity, material composition, and details of any hazardous materials.

Packing List

A detailed packing list specifying the contents of each crate or package is essential.

Bill of Lading

The bill of lading is the primary shipping document outlining the terms of carriage.

Insurance

Adequate cargo insurance is necessary to cover potential damage or loss during transit.

Permits & Licenses

Obtain all necessary export/import permits and licenses, including any hazardous materials permits and environmental permits.

OOG Cargo Notification

Notify all relevant parties (shipping line, port authorities, etc.) well in advance regarding the OOG cargo shipment.

Emergency Procedures

Accident Response Plan

A detailed emergency response plan must be in place to address potential accidents or incidents during transport. This should include procedures for dealing with spills of hazardous materials, fire, and other emergencies. Contact information for emergency services in all relevant locations should be readily available.

Transportation & Handling

Heavy-Lift Equipment

Arrange for heavy-lift equipment at both loading and discharge ports.

Specialised Transport

Specialised transport vehicles may be required for inland movement.

Port Handling

Coordinate with port authorities to ensure smooth handling and prevent delays.

Customs Clearance

Documentation

Ensure all necessary customs documentation is prepared and submitted in advance.

Compliance

Compliance with all relevant customs regulations in both exporting and importing countries is mandatory.

Cost Breakdown

The cost of shipping an industrial incinerator varies significantly based on size, weight, distance, shipping method, and specific regulatory requirements. A general breakdown includes:

  • Packaging and Crating: This can range from a few thousand to tens of thousands of pounds depending on the complexity of the crate and the need for specialized materials.
  • Transportation: Costs depend on the distance, mode of transport (sea, road, rail), and the need for specialized heavy-lift equipment. Expect significant expenses for OOG cargo.
  • Customs Duties and Taxes: These vary greatly depending on the destination country and the classification of the incinerator.
  • Insurance: The cost of cargo insurance will depend on the value of the incinerator and the level of coverage required.
  • Permits and Fees: Obtaining necessary permits and licenses can add considerable cost.
  • Handling and Stevedoring: Costs associated with loading, unloading, and handling the incinerator at ports.

Shipping International can provide a cost estimate.

Delivery & Installation

On-site Handling

Arrange for suitable equipment and personnel for on-site handling and installation at the final destination.

Disclaimer

Specific requirements vary. Consult Shipping International for a detailed assessment.

Contact Information

Shipping International
Tel: 0330 027 0450
This email address is being protected from spambots. You need JavaScript enabled to view it.

Unlock Global Reach with Expert Shipping Support

We understand the complexities of international shipping. Let us help you navigate them. 

Start the Conversation Today.

Industries

Automotive Machinery
Energy & Renewables Logistics
Oil & Gas
Chemical Logistics
Image