How To Ship Bulldozers

 

Ship your bulldozer internationally with Shipping International. Experts in heavy lift & OOG cargo, we handle permits, insurance, and transport. Get a quote today!

 

 

Shipping a Bulldozer: A Guide

Cargo Details

Essential Information:

  • Make, Model: (e.g., Caterpillar D11T)
  • Dimensions (L x W x H): (e.g., 12m x 4m x 4m)
  • Weight: (e.g., 45,000 kg)
  • Attached Implements: (e.g., Ripper, Blade) – specify dimensions and weight of each.

Shipping Method

Breakbulk (OOG):

Requires specialized heavy lift vessels. This method is typically necessary for oversized or out-of-gauge cargo like bulldozers due to their size and weight exceeding standard container dimensions.

Pre-Shipment Preparations

Survey:

A professional survey is crucial to confirm the precise dimensions and weight of the bulldozer and any attached implements. This accurate data is essential for planning the transportation and securing the necessary permits and vessel.

Port Selection:

Choosing the right port is vital. Factors to consider include crane capacity (specify tonnage), sufficient water depth (draft), proximity to the final destination to minimize inland transport costs, and the availability of heavy lift infrastructure to handle the bulldozer efficiently and safely. Suitable UK ports with heavy lift capabilities include, but are not limited to, Felixstowe, Southampton, and Immingham.

Vessel Booking:

Securing a suitable vessel with adequate crane capacity and sufficient deck space to accommodate the bulldozer is paramount. The vessel must be capable of handling Heavy Lift Cargo and must have the necessary equipment for safe loading and unloading.

Permits:

Obtaining the necessary permits is a critical step. This involves securing road permits from the relevant authorities for oversized/overweight transport on UK roads, port permits from the chosen port authority, and potentially customs permits depending on the import/export regulations of the countries involved.

Insurance:

Comprehensive cargo insurance is essential to protect against potential losses or damage during transit. This should include marine cargo insurance covering the bulldozer during the sea voyage and liability insurance to cover potential third-party claims.

Transportation

Loading:

The bulldozer will be transported to the port using a heavy-lift trailer. A crane will then be used to carefully load the bulldozer onto the vessel. Securement is critical, utilizing appropriate lashing, blocking, and bracing techniques such as chains, straps, and specialized securing systems designed for heavy machinery to prevent movement during transit.

Ocean Voyage:

The bulldozer will be transported via a heavy-lift vessel specifically designed to handle oversized and heavy cargo. The vessel's route will be carefully planned to ensure a safe and efficient journey.

Unloading:

Upon arrival at the destination port, a crane will be used to unload the bulldozer. A heavy-lift trailer will then transport it to its final destination.

Documentation

Essential Documents:

  • Commercial Invoice
  • Packing List detailing the contents and dimensions of the shipment
  • Bill of Lading serving as a contract of carriage between the shipper and the carrier
  • Certificate of Origin verifying the origin of the goods
  • Other necessary documentation (export/import licenses, phytosanitary certificates, etc.)

Key Considerations

Critical Factors:

  • Weight and Dimensions: Precise measurements are absolutely crucial for accurate planning and securement.
  • Route Planning: Careful route planning is essential to account for road restrictions, bridge clearances, and other potential obstacles during land transport.
  • Securement: Proper securement of the bulldozer throughout the entire journey is paramount to prevent damage and ensure safety.
  • Insurance: Adequate insurance coverage protects against potential losses or damage during transit.
  • Communication: Maintaining clear and consistent communication with all parties involved is vital for a smooth and efficient shipping process.

Potential Challenges and Mitigation

Addressing Potential Issues:

Potential challenges such as weather delays and port congestion can impact shipping schedules. Proactive measures, including contingency planning and real-time tracking, are employed to minimize disruption.

Disclaimer

This is a general guide. For specific advice tailored to your individual needs, please consult with a qualified heavy lift and OOG freight forwarder. Information on heavy lift and OOG shipping is also available from Shipping International.

Shipping International Contact Information

Shipping International
shippinginternational.co.uk
This email address is being protected from spambots. You need JavaScript enabled to view it.
Tel: 0330 027 0450

Unlock Global Reach with Expert Shipping Support

We understand the complexities of international shipping. Let us help you navigate them. 

Start the Conversation Today.