How To Ship Augers for Silo Systems

 

Need help shipping augers for silo systems? We've got you covered Learn about shipping, permits, packaging & customs. Contact us

 

 

Shipping Augers for Silo Systems

Cargo Assessment

A thorough cargo assessment is the foundation of a successful auger shipment. Accurate data minimises risks and ensures regulatory compliance.

Detailed Specifications

  • Precise dimensions (length, width, height) are essential for selecting the appropriate shipping method and container.
  • Accurate weight determination is critical for vessel and transport planning.
  • Material composition documentation, including certifications, is required for customs and regulatory compliance.
  • Hazardous material declaration (if applicable) is mandatory for safe handling and transport.
  • Center of gravity determination is crucial for safe loading and securing of the auger.
  • High-quality photographs and measurements provide a visual record and aid in damage assessment, if needed.

Shipping Method Selection

Selecting the optimal shipping method is vital for cost-effectiveness and safe transit. Several factors influence this decision.

Method Selection Criteria

  • Auger Dimensions & Weight: The auger's size, weight, and fragility dictate the suitable shipping options.
  • OOG (Out of Gauge): Augers exceeding standard container dimensions necessitate specialised containers or platforms. This requires meticulous planning and coordination.
  • Breakbulk: For exceptionally large or heavy augers, breakbulk shipping involves loading directly onto the vessel's deck. This demands detailed planning and specialised handling.
  • FCL (Full Container Load): Suitable only for smaller augers that fit within standard container dimensions and weight limits. Generally the most economical option for appropriately sized augers.

Permits and Documentation

Securing the correct permits and documentation is paramount for avoiding delays and ensuring legal compliance.

Essential Documentation

  • Export Licence: Obtain an export licence from the relevant authorities in the country of origin.
  • Import Licence: Secure an import licence from the relevant authorities in the destination country.
  • OOG/Breakbulk Permits: Obtain permits from port authorities and other relevant bodies when shipping OOG or Breakbulk cargo.
  • Cargo Insurance: Protect your investment with adequate insurance coverage against potential loss or damage.
  • Packing List: Provide a detailed list of all items, including dimensions, weight, and markings.
  • Commercial Invoice: Detail the sale of goods, including value, for customs valuation and tax purposes.
  • Bill of Lading: This document serves as the title for the goods and is issued by the carrier.
  • Incoterms: Clearly specify the chosen Incoterms (e.g., FOB, CIF) and their implications for responsibilities and costs.

Packaging and Crating

Proper packaging and crating are essential to protect the auger from damage during transit.

Robust Packaging

  • Custom Crating: Custom-built crates, typically steel or plywood, are essential for OOG and Breakbulk shipments to withstand the rigours of shipping.
  • Secure Fastening: Augers must be firmly secured within the crate to prevent movement and potential damage.
  • Clear Markings: Clearly mark crates with handling instructions, weight, dimensions, and contact information.
  • ISPM 15 Compliance: Ensure all wooden packaging materials meet ISPM 15 standards to prevent the spread of pests.
  • Shock Absorption: Utilize appropriate cushioning materials to minimise shock and vibration during transit.

Transportation Logistics

Efficient transportation logistics are crucial for timely and cost-effective delivery.

Efficient Transportation

  • Inland Transport: Arrange reliable transport from the origin to the port and from the port to the final destination, utilising trucks or rail as appropriate.
  • Port Handling: Coordinate closely with stevedores and terminal operators for efficient loading and unloading.
  • Vessel Selection: Choose a vessel suitable for the cargo's size and weight. Breakbulk shipments require vessels equipped with heavy lift equipment.
  • Route Surveys (OOG/Breakbulk): Conduct route surveys for oversized or heavy cargo to identify and mitigate potential obstacles.

Customs Clearance Procedures

Navigating customs clearance efficiently is essential for avoiding delays and penalties.

Smooth Customs Procedures

  • Export customs clearance: Complete all necessary export customs clearance procedures at the origin port.
  • Import customs clearance: Manage import customs clearance at the destination port, ensuring all documentation is accurate and complete.
  • Bonded Warehousing: Consider utilising bonded warehousing options for temporary storage and deferred duty payments.
  • HS Codes: Accurate HS (Harmonized System) codes are crucial for correct customs classification and duty assessment.

Delivery and Installation

The final stages of delivery and installation require careful planning and execution.

Final Delivery and Setup

  • Arrange Delivery: Arrange transport from the port of discharge to the final destination, ensuring appropriate handling equipment is available.
  • Installation: If required, arrange for professional installation services, considering specialised equipment and potential on-site risks.

Important Considerations

Several key factors should be considered throughout the shipping process.

Key Factors to Remember

  • Weight and Dimensions: Precise measurements are crucial for accurate costing, transport planning, and regulatory compliance.
  • Insurance: Adequate insurance coverage protects against potential loss or damage during transit.
  • Lead Times: OOG and breakbulk shipments typically require longer lead times compared to FCL shipments due to specialised handling and planning requirements.
  • Cost: OOG and breakbulk shipments are generally more expensive than FCL shipments due to the need for specialised equipment, handling, and permits.

Frequently Asked Questions

What is the difference between OOG and breakbulk shipping?

OOG (Out of Gauge) refers to cargo that exceeds the standard dimensions of a shipping container but can still be transported on a flat rack or open-top container. Breakbulk refers to cargo that is too large or heavy to be containerised and is loaded directly onto the vessel's deck.

How do I determine the correct HS code for my auger?

HS codes are complex and vary depending on the specific type of auger. Consult with a customs broker or refer to your country's customs tariff schedule for accurate classification.

What are Incoterms and why are they important?

Incoterms (International Commercial Terms) are a set of standardised trade terms that define the responsibilities of buyers and sellers in international transactions, including who is responsible for transportation, insurance, and customs clearance. Specifying the correct Incoterm is crucial for avoiding disputes and ensuring clarity regarding obligations.

How far in advance should I begin planning my auger shipment?

For standard FCL shipments, planning 2-4 weeks in advance is typically sufficient. However, for OOG and breakbulk shipments, allow for 6-8 weeks or more due to the need for specialised permits, route surveys, and equipment arrangements.

What type of insurance coverage do I need for my auger shipment?

The appropriate level of insurance coverage depends on the value of the auger and the potential risks involved. Consider all-risks coverage, which protects against a wide range of potential losses or damages during transit. Consult with an insurance provider to determine the optimal coverage for your specific needs.

Unlock Global Reach with Expert Shipping Support

We understand the complexities of international shipping. Let us help you navigate them. 

Start the Conversation Today.